Policy framework
The Renewable Energy Act (RA 9513) and Green Energy Auction Program (GEAP) provide long-term offtake structures and incentives for utility-scale renewable developers.
Gruppenergie Ventures Inc develops, builds, and operates utility-scale renewable energy projects across the Philippine archipelago — a 1,380 MW pipeline of solar and wind capacity in pre-development across Luzon and the Visayas.
A private Philippine renewable energy developer, incorporated in 2025 with leadership drawn from five decades of local wind and solar experience.
We develop, build, and operate utility-scale renewable energy projects across the Philippines — from greenfield resource assessment through commercial operations.
Our services cover the full project lifecycle: ground-mounted and floating solar PV, onshore and offshore wind, offtake structuring, engineering, construction oversight, and long-term operations and maintenance.
Every project in our pipeline is selected against three criteria: resource quality verified by on-site measurement, proximate grid access, and qualified offtaker demand.
The Philippines has set a 35% renewable energy share target by 2030 and 50% by 2040 — backed by structural policy reform and accelerating power demand across an archipelago of more than 7,000 islands.
The Renewable Energy Act (RA 9513) and Green Energy Auction Program (GEAP) provide long-term offtake structures and incentives for utility-scale renewable developers.
2022 amendments to the Public Service Act allow 100% foreign ownership of renewable energy projects — opening the market to international capital and strategic partners.
Philippine power demand grows at 5–7% annually, driven by industrialisation, urbanisation, and electrification — outpacing current generation additions.
NGCP transmission upgrades across Luzon and the Visayas continue to unlock new viable project sites, particularly in wind-rich and irradiance-rich corridors.
A diversified portfolio of utility-scale renewable capacity in pre-development across Luzon and the Visayas. Project-specific detail is shared with qualified counterparties under NDA.
We generate electricity, sell power, build projects, and maintain assets — end-to-end delivery supervised by our engineering team.
Ground-mounted and floating solar PV, with onshore and offshore wind plants — built and operated across a 25-year life.
PPA structures for distribution utilities, corporate offtakers, and cooperatives — priced against each counterparty’s load profile and tenor.
Feasibility, permitting, construction, and grid integration — from ECC and resource assessment through interconnection and commissioning.
Performance monitoring, preventative maintenance, and plant optimisation across a 25-year operating life.
Wind measurement, solar irradiance, bathymetry, and land-use screening against DOE resource maps and grid proximity.
DOE service contract, LGU endorsements, ECC issuance, FPIC where applicable, and NGCP interconnection study.
PPA signed with a distribution utility, corporate offtaker, or awarded through the Green Energy Auction Program.
Project close, EPC award, construction, and interconnection — supervised by Gruppenergie engineering end to end.
Commissioning, SCADA handover, and a 25-year O&M programme covering availability, performance, and compliance.
Our directors have led wind, solar, and grid infrastructure projects across the Philippines for most of their careers. Named leadership credentials and full bios are available to qualified parties under NDA.
Project origination, offtake structuring, commercial structuring, and GEAP bid strategy.
Resource assessment, design review, EPC oversight, and 25-year O&M programming across solar and wind.
NGCP interconnection studies, ERC liaison, high-voltage system design, and grid-scale storage integration.
DOE service contracts, ECC issuance, LGU endorsements, and national regulatory liaison end-to-end.
Contractor selection, construction supervision, QA/QC, and commissioning under a single engineering standard.
SCADA, performance monitoring, preventative maintenance, and compliance across a 25-year operating life.
Named leadership, CVs, and governance structure are shared with qualified counterparties as part of due diligence under executed non-disclosure agreement. Requests: info@gruppenergie.com.
We work with distribution utilities, electric cooperatives, corporate offtakers, landowners, and EPC partners to develop and deliver utility-scale solar and wind across Luzon and the Visayas.
Project information and partnership terms are shared with qualified counterparties under executed NDA. For power offtake (PPA), land, or development discussions, get in touch with our team.
Contact Us